BazEkon - Biblioteka Główna Uniwersytetu Ekonomicznego w Krakowie

BazEkon home page

Meny główne

Autor
Ahmad Hesham S. (Al-Zaytoonah University of Jordan, Jordan), Bazlamit Subhi M. (Al-Zaytoonah University of Jordan, Jordan), Jurczuk Arkadiusz (Bialystok University of Technology, Poland), Orłowski Cezary (WSB University in Gdańsk, Poland)
Tytuł
Success Factors of Project and Process Management - Lessons Learned from EPPM 2016
Źródło
Engineering Management in Production and Services, 2017, nr 3, s. 7-9, bibliogr. 13 poz.
Słowa kluczowe
Zarządzanie projektem, Zarządzanie procesami, Konferencja naukowa, Materiały konferencyjne, Zarządzanie produkcją, Inżynieria produkcji
Project management, Process management, Scientific conference, Conference materials, Production management, Production engineering
Abstrakt
The aim of this post-conference report is to present key-issues delivered by participants of the Project and Process Management sessions (PPM) at the 7th International Conference on Engineering, Project, and Production Management (EPPM 2016). EPPM 2016 was held in Bialystok, Poland in 21-23 September. The conference was organised by Bialystok University of Technology (BUT), the Association of Engineering, Project, and Production Management (EPPM), the International Society for Manufacturing, Service and Management Engineering (ISMSME), the Committee of Production Engineering of the Polish Academy of Sciences, and the Agency for Restructuring and Modernisation of Agriculture. The format of the EPPM 2016 Conference involved a mixture of keynote speeches, individual presentations on topical issues, and extensive panel discussions. It featured 89 papers in five thematic sessions across the two conference days. Over 115 delegates attended EPPM 2016 from more than 20 countries across Europe, Asia, and the rest of the world. Further information is available at eppm2016.pb.edu.pl. This international event explored key business and scientific problems, including findings, and enabled the introduction of new achievements in the field of engineering management, project and production management. (fragment of text)
Pełny tekst
Pokaż
Bibliografia
Pokaż
  1. Ahmad, H.S., Bazlamit, I.M., & Ayoush, M.D. (2017). Investigation of Document Management Systems in Small Size Construction Companies in Jordan. Procedia Engineering, 182, 3-9. doi:10.1016/j.proeng.2017.03.101
  2. Al-Hazim, N., Salem, Z.A., & Ahmad, H. (2017). Delay and Cost Overrun in Infrastructure Projects in Jordan. Procedia Engineering, 182, 18-24. doi:10.1016/j.proeng.2017.03.105
  3. Ayessaki, W.Y., & Smallwood, J. (2017). Influencing Workers' Performance through Health and Safety Interventions. Procedia Engineering, 182, 42-49. doi:10.1016/j.proeng.2017.03.111
  4. Bazlamit, S.M., Ahmad, H.S., & Al-Suleiman (Obaidat), T.I. (2017). Pavement Maintenance Applications Using Geographic Information Systems. Procedia Engineering, 182, 83-90. doi:10.1016/j.proeng.2017.03.123
  5. Dumrak, J., Baroudi, B., & Hadjinicolaou, N. (2017). Exploring the Association between Project Management Knowledge Areas and Sustainable Outcomes. Procedia Engineering, 182, 157-164. doi:10.1016/j.proeng.2017.03.152
  6. Gabryelczyk, R., & Jurczuk, A. (2017). Does Experience Matter? Factors Affecting the Understandability of the Business Process Modelling Notation. Procedia Engineering, 182, 198-205. doi:10.1016/j.proeng.2017.03.164
  7. Gurcanli, G.E., Turkoglu, H., & Bilir, S. (2017). Heavy Equipment Scheduling for Horizontal Construction Projects. Procedia Engineering, 182, 265-273. doi:10.1016/j.proeng.2017.03.189
  8. Hadjinicolaou, N., & Dumrak, J. (2017). Investigating Association of Benefits and Barriers in Project Portfolio Management to Project Success. Procedia Engineering, 182, 274-281. doi:10.1016/j.proeng.2017.03.191
  9. Niazi, G.A., & Painting, N. (2017). Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan. Procedia Engineering, 182, 510-517. doi:10.1016/j.proeng.2017.03.145
  10. Orłowski, C., Ziółkowski, A., & Paciorkiewicz, G. (2017). Quantitative Assessment of the IT Agile Transformation. Procedia Engineering, 182, 524-531. doi:10.1016/j.proeng.2017.03.147
  11. Peng, L., & Chua, D.K.H. (2017). Decision Support for Mobile Crane Lifting Plan with Building Information Modelling (BIM). Procedia Engineering, 182, 563-570. doi:10.1016/j.proeng.2017.03.154
  12. Pimchangthong, D., & Boonjing, V. (2017). Effects of Risk Management Practice on the Success of IT Project. Procedia Engineering, 182, 579-586. doi.org/10.1016/j.proeng.2017.03.158
  13. Snyman, T., & Smallwood, J. (2017). Improving Productivity in the Business of Construction. Procedia Engineering, 182, 651-657. doi:10.1016/j.proeng.2017.03.175
Cytowane przez
Pokaż
ISSN
2543-6597
Język
eng
URI / DOI
http://dx.doi.org/10.1515/emj-2017-0021
Udostępnij na Facebooku Udostępnij na Twitterze Udostępnij na Google+ Udostępnij na Pinterest Udostępnij na LinkedIn Wyślij znajomemu