BazEkon - Biblioteka Główna Uniwersytetu Ekonomicznego w Krakowie

BazEkon home page

Meny główne

Autor
Molenda Michał (Silesian University of Technology, Poland), Biernot Aneta (Automotive Company, Poland), Cierna Helena (Technical University in Zvolen, Slovak Republic)
Tytuł
Example of Using Lean Manufacturing Tools in Assessing and Improving the Process of Car Arm Rest Production
Źródło
Multidisciplinary Aspects of Production Engineering, 2018, vol. 1, s. 217-222, rys., tab., bibliogr. 11 poz.
Słowa kluczowe
Odchudzone zarządzanie, Odchudzanie produkcji
Lean management, Lean production
Uwagi
streszcz., summ.
Abstrakt
The paper deals with the use of Lean Manufacturing tools in improving the production process of car arm rests in a car manufacturing company in Poland. The article describes the original condition of a single production process of assembling ready pieces to produce car arm rests. The original condition was assessed and described with the use of some basic Lean indicators and value stream mapping. The aforementioned tools allowed to assess the process condition and to identify the organizational issues and their sources. It also enabled to reorganize the process and increase its efficiency. The further part of the article describes the results of improvement actions. The process assessment was held and improvements introduced in the first quarter of 2018. (original abstract)
Pełny tekst
Pokaż
Bibliografia
Pokaż
  1. Książek, D. and Ligarski, M. (2016).The role of the factory production control in the improvement of products and processes. In: A. Gębalska-Kwiecień, ed., Management Systems in Production Engineering. No.4. Gliwice: P.A. Nova S.A., pp. 68-79.
  2. Łopatowska, J. and Jaroński, J. (2016). Doskonalenie przepływu materiału w linii produkcyjnej. [online] Available at: http://www.ptzp.org.pl/files/konferencje/kzz/artyk_pdf_2016/T1/t1_0632.pdf [Accessed 15 May 2018]
  3. Midor, K. (2017).Use of Six Sigma in the production process - case study. In: M.J. Ligarski, ed., Systems supporting production engineering vol. 6 iss. 4. Gliwice: P.A. NOVA pp. 147-152.
  4. Pałucha, K. (2012). World Class Manufacturing model in production management. Archives of Materials Science and Engineering. vol. 58(2), pp. 227-234.
  5. Rother, M., Shook, J., (1998). Learning to see. Value stream mapping to create value and eliminate muda. Brookline: The Lean Enterprise Institute Inc.
  6. Stecuła, K., Tutak, M. and Brodny, J., (2017). Application of chosen elements from Japanese production and maintenance management philosophies in Polish coal mines. In: 17th International Multidisciplinary Scientific GeoConference SGEM. Conference proceedings Vol. 17, Science and technologies in geology, exploration and mining. Iss. 13 - Exploration and mining. Sofia: STEF9 Technology, pp. 93-100.
  7. Velacio.com 2018. Velacio Website. [online] Available at: http://www. velaction.com [Accessed 15 May. 2018].
  8. Wojtaszak, M. and Biały, W. (2013). Measurement system analysis of attribute or continuous data, as a one of the first steps in Lean Six Sigma projects. In: J. Kaźmierczak, ed., Systems supporting production engineering. Gliwice: P.A. NOVA, pp. 144-162
  9. Wolniak, R. and Skotnicka-Zasadzień, B. (2014).The use of value stream mapping to introduction of organizational innovation in industry; Metalurgija vol. 53 iss. 4, pp. 709-712
  10. Womack, J. P., Jones, D.T., Ross, D. (1990).The machines that changed the World. New York: Rawson Associates.
  11. Zasadzień, M. (2015). The effect of implementation maintenance cards in performance of machines in selected production company. Management Systems in Production Engineering No. 4 (20). pp. 225-229.
Cytowane przez
Pokaż
ISSN
2545-2827
Język
eng
URI / DOI
http://dx.doi.org/10.2478/mape-2018-0028
Udostępnij na Facebooku Udostępnij na Twitterze Udostępnij na Google+ Udostępnij na Pinterest Udostępnij na LinkedIn Wyślij znajomemu